2020/2021 Build Project
The 2020 build project on Green Hill Road in Conway has begun. Site clearing took place in February of 2020 thanks to the mild winter. Late February heavy machinery was brought onto the site to clear the debris and start preparing for the foundation. Early March due to mild temps allowed for the foundation forms to be set and poured getting us ahead of our typical build schedule this time of year. Over the month of March the slab was poured, well was drilled, septic system was installed and radiant heat piping went in. Due to Covid-19 all construction and volunteering was put on hold for the duration of 2020 and winter of 2021. Spring 2021 the team resumed building and made quick work to get back on track over the summer and fall.